The all-in-one platform for building in Ghana: free cost calculator, AI floor plans, a materials & labour marketplace, and construction management - whether you design with us or bring a build already underway.
Building from abroad? Plan, price, and track your Ghana project with more control.
Where are you in your build?

This house: 9 bedrooms · 3 storeys · 432 m²
Total estimated cost
GHS 1,795,565
Measured from the generated floor plan
One platform, three stages
Most tools stop at a drawing. GhanaHousePlanner carries the same house from its cost, to a code-checked design, to the build itself, with self-serve tools and our team on call at every stage.
Ghana-specific prices for every region, including the items informal quotes tend to leave out.
Our team can help

Describe your home to the AI Design Agent, or upload a plan you already have. Either way, every room is checked.
Our team can help

Bring a build you started anywhere and run it like a project: phases, budget, team and documents in one place, with progress straight from the site.
Our team can help
Watch a house plan come together in 2D and 3D, or click through the platform yourself before you sign up.
Demo not loading? Open full-screen demo →
Tools and services for every stage, and for the people who build for a living.
Accurate pricing and materials for Ghanaian construction




Design, compliance, cost, materials, and site supervision stay in one connected project — not scattered across separate calculators, marketplaces, and spreadsheets.
Watch how Ghanaians in the UK, USA, and Canada are using GhanaHousePlanner to plan, budget, and track their builds back home — without being on-site.
Tap to start — from anywhere
The only platform providing end-to-end building certainty for the Ghanaian market.
| Feature | GhanaHousePlanner | Planner 5D | Maramani |
|---|---|---|---|
| Ghana-Specific Pricing | All 16 regions | Generic | Limited |
| GhBC Compliance | Built-in | No | No |
| Project Management | Free tier | No | No |
| Diaspora Features | Real-time tracking | No | No |
| Material Sourcing | CornerStore, with supplier ratings & reviews | No | Limited |
| Buyer Payment Protection | Escrow, held until delivery confirmed | Not offered | Not offered |
| Cost Accuracy | ±5-10% | Varies widely | Varies widely |
| BIM Export (IFC · DXF · GLTF) | Pro & Starter | Not offered | Not offered |
| UCC & KNUST Research Backing | Validated | None | None |
Not guesswork. Our pricing engine is validated by a parametric study that quantified Ghana's "Completeness Gap" — the systematic shortfall between informal contractor quotes and real construction costs.
"A family budgets GHS 600,000 for a 3-bedroom home. Our research shows the actual cost is approximately GHS 790,000 — they are GHS 190,000 short before they break ground."
— Emmanuel Apaaboah & Bernard Opoku, University of Cape Coast / KNUST, 2026
Join thousands using GhanaHousePlanner to estimate costs, compare regions, and plan homes in Ghana.
No credit card required • Free cost calculator • Optional AI design, editor, exports, and project tools