Cookies

We use analytics cookies to see which pages help people plan their build, so we can improve them. No ads, and we don't sell your data. You can change this any time under Cookie settings. Privacy policy

Chat on WhatsApp
Render My House

See your house before it's built.

A photograph of every room, a walkthrough video and a 360° tour of your house, from your floor plan, your architect's model or your drawings. Ready in hours, not weeks.

  • Photo or PDF of a plan, redrawn first
  • ArchiCAD, Revit, AutoCAD, SketchUp
  • Your files stay private
  • From GHS 1,500, our errors fixed free

How it works, what to upload and who it's for: the Render My House guide

What your set looks like

Renders made by our renderer from two floor plans: every room is shot like this, with the walkthrough and the 360° tour.

  • The front of the house
    The front of the house
  • The front at evening, lights on
    The front at evening, lights on
  • Living room
    Living room
  • Kitchen
    Kitchen
  • Bedroom
    Bedroom
  • Professional: a branded copy (a bungalow)
    Professional: a branded copy (a bungalow)Professional

Upload your house

A floor-plan photo or PDF, or your model or drawing. We check it for free before you pay.

You'll sign in when you choose a file: your file stays selected.

Exporting from your program

Project files (.pln, .rvt, .dwg, .skp) only open in their own programs, so export your house in one of these formats first.

ArchiCAD

IFC

FileSave asIFC (.ifc)

Include all storeys, and the zones: they give us your room names.

Revit

IFCFBX

FileExportIFC

orFileExportFBX

In the IFC options, export rooms as spaces so we get your room names.

AutoCAD

DXFFBX

2D planSave AsDXF

3D modelFBXEXPORT

One DXF a floor: zip them together, named so the ground floor comes first.

SketchUp

GLBOBJFBX

FileExport3D Model

Zip the model with its texture folder to keep its own colours.

Blender, Rhino and others

GLBFBXOBJ

ExportglTF Binary (.glb)

GLB is best: one file with its textures inside.

A drawing on paper

PhotoPDF

We redraw it first with Upload My House Plan: you check every room, then we render the plan you saved.

Frequently asked questions

What do the photographs show?

Your house as you designed it, laid out room by room, in daylight: its walls, doors and windows where your plan or model has them, with standard Ghanaian finishes (plastered and painted walls, tiled floors, a long-span roof) and furniture placed in each room. From a photo or PDF, we first redraw your plan (Upload My House Plan): you check and correct every room, save it, and we render the plan you saved, with our standard heights, roof and finishes, not your architect's elevations. From a 3D model we render your model itself.

What's the difference between Photos, Home and Professional?

Photos (GHS 1,500) is a photograph of every room and the outside (the front by day and at evening, lights on, the back, from the street and from above) and a 360° tour of the main rooms. Home (GHS 2,500) adds a walkthrough video of the whole house, room by room and up the stairs, and a 3D floor plan of each floor, furnished, with every room named and its size. Professional (GHS 4,500) has everything in Home with the photographs in 4K and the walkthrough in 1080p, adds two 12-second teasers at golden hour (wide, and tall for Status, Reels and TikTok), a reel of about 17 seconds through the best rooms and the 3D floor plan, a 14-second drone clip round the house from above at golden hour, portrait (4:5) copies of the front and the key rooms for social media, and a branded copy of every image and teaser with your logo, phone number and website on a strip along the bottom; it's made first when our machines are busy. You can change your branding after delivery and get new branded copies at no charge.

Can I start with the photographs and add the video later?

Yes. Order the Photos set, and within the 30 days we keep your files, add the walkthrough video from your order page for GHS 1,000, the difference to Home. We make only the video: your photographs stay as they are.

Can I choose how the house looks?

Yes, before you pay: tell us what the pictures are for, pick the outside look (modern, warm, Mediterranean, coastal or luxury) and the wall and roof colours. It's all in the set's price, and you can skip it: we then choose from your house's style. Your set is made to the brief you confirm, and if it doesn't match it, we fix it free.

Can I see a preview before I pay?

Before you pay, we check that your file opens and holds a house, and tell you what we found (floors, rooms, its size). Nothing of the result is shown before payment. If we get something wrong in your set, we fix it at no charge (see below).

What if something in my set isn't right?

If we got something wrong, we fix it at no charge. That covers a render that doesn't match your plan or model (a wall, door, window or room missing, in the wrong place or the wrong size) or your brief (the look and colours you chose), and render faults: something floating or cutting through a wall, furniture blocking a door, a broken or black image, a video that stops, a room missing from the set. Tell us on your order page while we keep your set (30 days after delivery): we reply within three working days and make those renders again. Our standard finishes, colours, furniture and decor, and the camera angles, are part of the set as described; so are the standard heights and roof of a plan redrawn from a photo or PDF. And if we can't make your set at all, we refund you in full.

Can I change something after delivery?

Yes, without a new order. Tell us on your order page what you'd like, for example a different look outside, another wall or roof colour: our team quotes the change there, you pay only for that change, and we make your set again with it. A different design or plan is a new order.

How long does it take?

Usually one to three hours after you pay; a large house with many rooms can take longer. You don't need to keep the page open: we email you when your set is ready.

I'm building the house. Can I manage the build here too?

Yes, with our Starter plan: your house as a project with its plan, the Ghana Building Code compliance report, the cost estimate and bill of quantities, and supervision for the build (site logs and photos, phase checks, WhatsApp site logs). Subscribe to a yearly Starter plan within a month of paying for your renders and it's 30% off (GHS 350 instead of GHS 500). It's applied at checkout automatically, once, and it doesn't combine with a promo code or the upload credit: you get whichever saves more.

How long do you keep my files?

Your uploaded file and your renders are kept for 30 days after delivery, then deleted. Download what you want to keep. Renders of a GhanaHousePlanner project also stay in its Document Vault.

Can I use the renders to market and sell?

Yes. The photographs, video and tour are yours to use, at no extra charge: on your website and social media, in brochures, pitch decks, adverts and sales listings, and to show your bank or buyers. We don't show your renders publicly without your permission.

Do you send back the 3D model or the plan?

No: you get the photographs, the video and the tour, never your plan or model.